
Atlantis The Royal
Palm Jumeirah, Dubai · 2023
Back-of-house wet-area waterproofing — 6,400 m²
Waterproofing Systems · Brand-certified applicator
We apply the system the consultant spec'd — at the WFT they spec'd, at the lap dimensions they spec'd, on the substrate moisture they spec'd. The membrane only fails when one of those is wrong. We get all four right.

What we do
Waterproofing is the system that fails most often in UAE construction — and it's the system clients hide. By the time water shows up on a ceiling, the membrane underneath has already been failing for months. We work upstream: site survey, substrate prep, primer, the right system at the right thickness, full IR sign-off, and the protection layer before the next trade walks on it.
We're an approved applicator for MAPEI, Laticrete, AkzoNobel and X-Calibur — which means our crews are trained on each manufacturer's protocols and our work qualifies for joint manufacturer-applicator warranties where available. We don't switch systems mid-project. We don't skip the primer to save half a day. We document every step with photos, moisture readings and IR sign-offs that go straight into the project handover file.
Choose the system
Five common UAE applications, each mapped to the system we'd recommend on site. Click through to see indicative spec and the manufacturer's TDS.
Select application
Recommended system
X-Calibur
PolyU 600 (liquid polyurethane)
Roller-applied, UV-stable
Indicative spec
Not sure which fits your site? Send us the spec or drawing and we'll come back with the right system.
Build-up
Lap & overlap discipline
Our process
Where it fits
Brands we apply
MAPEI
Mapelastic Smart · Mapelastic Foundation · Mapelastic Aquadefense · Idrosilex Pronto · Mapenet 150
Laticrete
Hydro Ban · Hydro Ban 9235 · Hydro Ban Sheet Membrane · Plazadeck
AkzoNobel
Dulux Weathershield Waterguard
X-Calibur
PolyU 600 · PolyU 800 · GRP lining system · Crystalline range
Reference projects

Atlantis The Royal
Palm Jumeirah, Dubai · 2023
Back-of-house wet-area waterproofing — 6,400 m²

Al Wathba Desert Resort & Spa
Abu Dhabi · 2022
Spa wet rooms + podium liquid-PU build-up
St. Regis — back of house
Dubai · 2024
Cementitious + PU combination, MEP coordination
Warranty
5-year workmanship warranty on cementitious systems. 10 years on liquid PU and bituminous. Up to 20 years on GRP.
Joint manufacturer-applicator warranties are available on Mapei and X-Calibur systems where the site is inspected by the manufacturer at handover. Talk to us before award if a JM warranty is in the spec.
Warranty term
Frequently asked
An applicator is trained and certified by a specific manufacturer to apply that manufacturer's systems to TDS spec. The work qualifies for joint manufacturer-applicator warranties. A general contractor applies materials from whatever supplier wins the trade; warranties are workmanship-only.
Depends on the application. For exposed flat roofs and podiums, UV-stable liquid PU (X-Calibur PolyU 600) handles thermal cycling well. For wet areas under tile, cementitious flexible (Mapei Mapelastic Smart) is the safe default — it's mesh-reinforced and tile-compatible. For water tanks, GRP. We don't recommend one system for everything.
Cementitious systems: 5–10 years. Liquid PU: 10–15 years if protected. GRP: 15–20 years. Self-adhered bituminous sheet: 10–15 years. Lifespan depends as much on the substrate prep and the protection layer above as on the membrane itself.
Indicative ranges only — every job is quoted after a site survey. Cementitious: AED 45–75 / m². Liquid PU: AED 75–140 / m². GRP: AED 140–220 / m². Polyurea (sprayed): AED 200–320 / m². Add 15–25 % for difficult access, night works, or fast-track programmes.
For new construction, no — we waterproof during the build. For refurbishment, we usually do — you can't waterproof over a leaking, contaminated substrate and expect bond. We sometimes overlay with GRP on water tanks where demolition is impractical.
Walk-on for cementitious: 24 hr. Full cure: 7 days. PU walk-on: 24–48 hr. Tile-ready cure: 5–7 days. We don't release for the next trade until cure is verified and the IR is signed off.
Yes — and we recommend it on every horizontal application. 24–48 hr flood, 50 mm head, monitored leak paths below. Documented with photos and a report.
A warranty co-issued by the manufacturer and the applicator that covers both the material and the workmanship. The manufacturer's technical rep inspects the site at key milestones (substrate, primer, first coat, final coat) and signs off. Available on Mapei and X-Calibur systems when registered before mobilisation.
Yes — we prepare the Prior Approval Request (PAR), the method statement, the TDS / SDS pack, the mockup proposal, and the Inspection Request (IR) for each milestone. The consultant approval pack is part of our scope.
We re-price and re-submit. We don't apply a system that isn't in writing.
Related disciplines
Free site survey across Dubai, Abu Dhabi and Sharjah. Written quotation back within 48 working hours.